Project Description

This was the site of a massive wind energy project. In DeKalb County, 119 wind turbines were built. When the turbines were completed, we were hired to repair, overlay and strengthen the rural low-volume roads used during the project. We placed 20 miles of asphalt pavement (42,000 tons) so the existing roadways were to equal or better condition than when the project started.