Project Description

Curran was awarded the earthwork and landscaping contract by Harbour Contractors for the Stepan Chemical South Rail Spur project located in Elwood Illinois.

The work consisted of topsoil excavation and respread, storm sewer work, 25,000 CY mass site excavation, placement of CA6 as sub-ballast for the storage tracks, rock excavation, erosion control, and landscaping.

The project required specialty training and extensive coordination with the live railroad tracks. Curran provided value engineering to the GC and owners, and was able to meet the challenges while staying within budget, along with meeting the owners schedule.